FD2.8-800W
   
FD3.2-1500W
   
FD8-15KW
   
FD10-20KW
   
   
Qingdao Anhua New Energy Development Co., Ltd.
Home  
 
             
 
         
 

   Installation

The installation is to be regarded as permanent and consists of a tower with the turbine on top, the connecting wire to your electricity supply and the electronic control which looks after the generated electric power. Over all it will take approximately 2-3 weeks to fully install.